Work on St. Clair drawbridge begins Monday

j6b_gkaq_400x400-jpg-21

Work begins Monday on a frequently traveled drawbridge in St. Clair. The Michigan Department of Transportation is announcing that the M-29 bridge over the Pine River will be the subject of a $1.2 million  investment from the state. Drivers can expect single lane closures starting December 19th with full overnight closures planned for the spring. Work includes repair to the hydraulic cylinder, tail lock, and concrete patching on the bridge substructure. MDOT says the work will address mechanical components of the bridge that are necessary for smooth operation during the boating season.